 |
|
 |

TAXES | LICENSES | ZONING FEES | FINES | UTILITY FEES
WATER CONNECTION | SEWER CONNECTION | UTILITY TAX
Real Estate Taxes: $0.16 per $100.00 assessed value (based on 100% assessment)
Personal Property Taxes: $1.11 per $100.00 assessed value (based on 100% assessment)
PPTRA (Personal Property Tax Relief Amount) 42%
Machinery & Tools: $0.86 per $100.00 assessed value (based on 100% assessment)
Meals Tax: The purchaser of any prepared food and drink, including alcoholic beverages, served, sold or delivered in the town by a restaurant or caterer for the purpose of being consumed by an individual or group of individuals at one time to satisfy the appetite, a tax equivalent of five percent
(5%) of the amount paid shall be levied.
Lodging Tax: 5%
BACK TO TOP
Motor Vehicle License Fee (added to June 5 Personal Property tax bill):
- $25.00 per motor vehicle
- $10.00 per trailer (over 1500 gwt)
- $18.00 per motorcycle
- $ 1.00 per transfer fee
Town Stickers will no longer be used.
BACK TO TOP
Zoning Permit: $40.00 - New Home Construction
$25.00 - Addition
$15.00 - fence
$75 - Commercial
If no building permit required - $15.00
Rezoning: $1,500 plus $100 per acre
$ 500.00 Proffer Revision
Site Plan: $1,000 plus $35 per unit ERC* not to
exceed $2,500
$ 500 Minor (increase structure by 20% or less, does not exceed 5,000 sq.
ft.)
$ 500 3rd and subsequent reviews
* Engineering Review Costs
Subdivision Approval: Final Plat - $750 plus $115 per
lot
Minor (4 lots or less) - $350 plus $25 per lot
Administrative Approval (Includes BLA) - $75
Master Development Plan: $750 plus $75 per acre
Revision - $500
Board of Zoning Appeals: Variance - $250 (Includes cost
of zoning permit)
Zoning Ordinance Amendment Request: $500 per section
Special Use Permit: Home Business - $250
Other - $500 Telecommunication Towers - $1,000
Annexation: $2,000 plus $50 per acre
Zoning Certification Letter: $100
Zoning Determination Letter: $50
Right-of-Way Vacation: $175
Re-Advertisement Fee: $125
Text Copies: Comprehensive Plan - $20
Zoning Ordinance - $25 Subdivision Ordinance - $20
Water & Sewer Specs - $20
If consulting services are required for any reason, it will be at the cost of
the applicant.
Inspection Fees:
Residential
Per Lot
$ 500
Fill water mains
$ 6.70 per 1,000 gallons used
Testing
Hourly based on personnel time and wages
Flushing
Calculated on amount of water used @ $6.70 per 1,000 gallons
Bacteria sample
$ 75.00 per sample
Commercial and Industrial per lot fee
Based on size of lot and project using actual cost of personnel time and
wages
Inspections after hours, weekends, and holidays are charged at overtime
rate.
BACK TO TOP
Illegal Parking: Misdemeanor punishable by fine not less than $3.00 nor more than $5.00
BACK TO TOP
The billing cycle is monthly.
|
WATER: Sec. 18-25 of the Strasburg Town Code
|
Residential:
$11.55 minimum per 2,000 gallons;
5.60 per 1,000 gallons over minimum
Outside Town Limits:
same as above plus 40% more
Commercial:
$11.95 minimum per 2,000 gallons;
7.80 per 1,000 gallons over minimum
Outside Town Limits:
same as above plus 40% more
Utility Penalty:
5% assessed per billing cycle after 20th of month
Reconnection Fee:
$50.00 when disconnected due to nonpayment
of utility bill
Reread Fee:
$10.00
Test Meter:
$10.00 (if meter is incorrect this will be refunded)
Water Deposit (all renters):
$100
|
 |
|
SEWER: Sec. 18-46 of the Strasburg Town Code
|
Residential:
$12.10 minimum per 2,000 gallons;
$6.10 per 1,000 gallons over minimum
Outside Town Limits:
same as above plus 40% more
Commercial:
$12.10 minimum per 2,000 gallons;
$7.60 per 1,000 gallons over minimum
Outside Town Limits:
same as above plus 40% more
$8.00 per household/apt. per month
|
BACK TO TOP
|
WATER CONNECTION - Section 86-30
|
|
+ Cost of meter |
| Residential Availability Fee |
In-Town |
|
50% Outside |
| Dwelling, individually metered: (includes single family, duplex,
multi-family or mobile homes, except as provided below) |
$8,000 |
|
$12,000 |
| Commercial/Industrial Use, or
Dwelling not individually metered: |
|
|
|
| 3/4" or 5/8" meter |
$8,000 |
|
$12,000 |
| 1" meter |
$9,500 |
|
$14,250 |
| 1 1/2" meter |
$11,000 |
|
$16,500 |
| 2" meter |
$13,000 |
|
$19,500 |
| 3" meter |
$19,500 |
|
$29,250 |
| 4" meter |
$24,500 |
|
$36,750 |
| 6" meter |
$29,500 |
|
$44,250 |
| 8" meter |
$34,500 |
|
$51,750 |
| 10" meter |
$40,000 |
|
$60,000 |
| Hotel/Motels |
Size of meter plus $300/guest room |
| Nursing/Convalescent Homes |
Size of meter plus $350/patient room |
| Hospitals +Plus cost of meter |
Size of meter plus $800/patient room |
BACK TO TOP
|
SEWER CONNECTION - Section 86-238
|
| Residential Availability Fee |
In-Town |
|
50% Outside |
| Dwelling, individually metered: (includes single family, duplex,
multi-family or mobile homes, except as provided below) |
$8,000 |
|
$12,000 |
| Commercial/Industrial Use, or Dwelling not individually metered: |
|
|
|
| 3/4" or 5/8" meter |
$8,000 |
|
$12,000 |
| 1" meter |
$11,000 |
| $16,500 |
| 1 1/2" meter |
$15,000 |
|
$22,500 |
| 2" meter |
$23,000 |
|
$34,500 |
| 3" meter |
$31,000 |
|
$46,500 |
| 4" meter |
$39,000 |
|
$58,500 |
| 6" meter |
$47,000 |
|
$70,500 |
| 8" meter |
$55,000 |
|
$82,500 |
| 10" meter |
$63,000 |
|
$94,500 |
| Hotel/Motels |
Size of meter plus $500/guest room |
| Nursing/Convalescent Homes |
Size of meter plus $700/patient room |
| Hospitals |
Size of meter plus $2,000/patient room |
BACK TO TOP
|
UTILITY TAX - SECTION 26-8
|
Residential User: Tax shall be 20% of charge (exclusive of any Federal Tax) made by the seller against the purchaser with respect to each utility service. On the amount charged in excess of $5.00 -no tax computed.
Commercial/Industrial: Tax shall be 20% of first $50.00 of charge (exclusive of any Federal Tax) on amount in excess of $50.00 - no tax computed.
BACK TO TOP
|
DEADLINES FOR APPLICATIONS
|
Strasburg Planning
Commission Application Submission Deadlines -2008
for Rezonings, Special
Use Permits, Site Plans, Annexations and Subdivision Plats
|
Submission Deadline** |
Planning Commission Worksession |
Planning Commission
Regular Meeting |
Town Council Meeting |
|
December 20, 2007 |
January 10, 2008 |
January 22, 2008 |
February 12, 2008 |
|
January 24 |
February 14 |
February 26 |
March 11 |
|
February 21 |
March 13 |
March 25 |
April 8 |
|
March 20 |
April 10 |
April 22 |
May 13 |
|
April 24 |
May 15 |
May 27 |
June 10 |
|
May 22 |
June 12 |
June 24 |
July 8 |
|
June 19 |
July 10 |
July 22 |
August 12 |
|
July 24 |
August 14 |
August 26 |
September 9 |
|
August 21 |
September 11 |
September 23 |
October 14 |
|
September 25 |
October 16 |
October 28 |
November 11 |
|
October 23 |
November 13 |
November 25 |
December 9 |
|
November 20 |
December 11 |
December 23 |
January 13 |
**A complete application must be
submitted by this deadline. An application is not considered
complete until it includes all required agency comments as well as
other required application forms, plats, plans, etc.
BACK TO TOP
SITE DESIGNED BY SUSQUEHANNA TECHNOLOGIES
|
 |